email for a free inspection: info@piperelinesolutions.com
northern colorado county
30” Snap-Tite Self-Install, February 2021
details
With water levels at their lowest point of the year, it was time for them to line a failing culvert.
​
Their failing culvert, a 36” CMP with dips to ~31” in height and a rusted invert was supporting County Road 74E, between U.S. Highway 287 and Red Feather.
problem
Digging & replacing was not an option since this highway eliminated a 3-hour detour for, potentially, thousands of cars every day. Plus, with 25’ of cover beneath the paved road, this wouldn’t be a simple dig & replace project.
solution
Their solution was to self-install 140’ of 30” SnapTite with a homemade bullet nose to maneuver through the failing culvert with ease. Even with the dips and sub-zero temperatures, the bullet nose and ease of snapping allowed the 140’ to be lined in ~4 hours.
​
A bulkhead would be built the following day and then structurally reinforced by grouting.
​